The Advantage and
Disadvantage of The Toll Road Project Pemalang Batang
Trans
Java Toll Java toll road network connecting the city on the island of Java,
this highway connects the two largest cities in Indonesia, Jakarta and Surabaya
via toll road Nah later this toll will be divided into 3 Toll Road Section gan
Namitu North Line, Central Line and South Line .This extended length is 642.56
KM. This Toll can grow the economy of Indonesia. After the completion of the
toll road can unravel the congestion at various points of pantura.
The
toll road project is still in the process of construction since a few months
ago. This toll road project from Pemalang up to Batang and passing through the
Pekalongan Regency.
This
toll road project passes through Pekalongan Regency including Bojong District,
Pekajangan and Sragi. Those who manage the toll road projects land acquisition
house residents affected by the toll road, in toll road projects resulted in
some negative impact and positive. The positive impact is that after highway
construction is completed to reduce congestion.
While,
the negative impact is congestion on the road, the land compensation house
residents affected by the toll road, in addition to accidents on the road due
to the ground scattering of spilled, a slippery road, the road is perforated
and dust that interfere with breathing.
I
think to reduce the negative impact of the toll road projects that by filing an
agreement between parties that manage with local government to repair damaged
roads after the toll road project is completed. If with a slippery road so that
the road users be careful in driving as for the dust should be water little by
little when the time of afternoon so as not to interfere with breathing.